Atlas-Beren Systems

Connected business operations

Light manufacturing

Connect labor and machine time to purchasing, batches, and quality.

Fictional sample workspaceTry every workflow. Changes stay in this page and reset on reload.
Reporting & priorities

Sample bill of materials

planned

10 each of Sample finished assembly · Sample Workshop · Due 2026-10-06

Batch 00000028 · Sample make-to-stock order

Materials: 5.000 kg Sample raw material
  1. ○ Prepare materials
  2. ○ Assemble
  3. ○ Inspect dimensions

Bills of materials & assembly plans

Sample bill of materials

Yield 10 each · 1 inputs · 3 steps

Material planning, capacity & traceability

Saved working views

Sign in to a live workspace to save personal and team views.

Optional POS / order demand import

Import reviewed order quantities as planned batches. Source line IDs prevent duplicate imports. Stock is reserved and consumed only through the normal production workflow.

Planned material demand

Sample raw material at Sample Workshop: 5 required / 5 covered by usable stock · shortage 0 · first due 2026-10-06

Recipe v1 · planned 10 · actual not released · scrap 0